Authority to Operate: Months Faster, Fraction of the Cost

Traditional ATO processes take 6-18 months and cost $500K-$2M for complex systems. smartNOC's compliance-by-design architecture and automated evidence collection can compress timelines to weeks and reduce costs by 60-80%.

RMF Alignment ATO Timeline Continuous Monitoring
The ATO Challenge

Obtaining an Authority to Operate (ATO) for federal information systems is a rigorous, time-consuming process. The typical timeline:

Phase Traditional Duration Key Bottlenecks
Preparation 2-4 months System inventory, boundary definition, control selection
Documentation 3-6 months Security plan, procedures, control descriptions, evidence gathering
Assessment 1-3 months 3PAO engagement, testing, finding remediation
Authorization 1-2 months AO review, risk acceptance, POA&M negotiation
Continuous Monitoring Ongoing Monthly reporting, annual assessment, change management

smartNOC's architecture addresses the bottlenecks at each phase, compressing 12-18 month timelines to 8-12 weeks for contractor systems and 3-6 months for agency systems.

Risk Management Framework (RMF) Alignment

RMF Six Steps

NIST SP 800-37 defines the Risk Management Framework with six steps. smartNOC provides capabilities that accelerate each step.

Step 1: Categorize

Traditional: Manual system inventory and FIPS 199 categorization

smartNOC: CMDB auto-discovers all assets, DDB provides service taxonomy, categorization templates pre-populated

Time Saved: 2-4 weeks

Step 2: Select

Traditional: Manual control selection from NIST 800-53, tailoring, overlay application

smartNOC: Pre-mapped 800-171 controls, automated tailoring based on system characteristics, CMMC/FedRAMP overlays available

Time Saved: 3-6 weeks

Step 3: Implement

Traditional: Manual configuration, policy creation, procedural development

smartNOC: Controls implemented in platform architecture, immutable base images, declarative configuration

Time Saved: 8-16 weeks

Step 4: Assess

Traditional: 3PAO testing, evidence gathering, finding remediation cycles

smartNOC: Doghouse automated testing, continuous evidence collection, pre-remediation via ConMon

Time Saved: 4-8 weeks

Step 5: Authorize

Traditional: POA&M negotiation, risk acceptance documentation, authorization package review

smartNOC: Pre-assessed controls, automated POA&M tracking, real-time risk dashboard for AO

Time Saved: 2-4 weeks

Step 6: Monitor

Traditional: Manual monthly reports, quarterly reviews, annual reassessment

smartNOC: Automated ConMon reporting, real-time dashboards, continuous control validation

Ongoing Savings: 150-250 hours/year

Accelerated ATO Timeline

Comparison of traditional ATO process versus smartNOC-enabled process for a moderate-complexity system (100-200 controls):

Milestone Traditional With smartNOC Key Accelerator
System Categorization Week 1-4 Week 1 CMDB auto-discovery
Control Selection Week 5-10 Week 2 Pre-mapped controls
Security Plan Draft Week 11-18 Week 3-4 Generated from CMDB + templates
Control Implementation Week 19-30 Pre-existing Built into platform
Evidence Collection Week 31-38 Week 5 Automated, continuous
3PAO Assessment Week 39-46 Week 6-8 Doghouse pre-validation
Remediation Week 47-50 Minimal Pre-remediation via ConMon
Authorization Decision Week 51-56 Week 9-12 Risk dashboard for AO
Total Duration 12-14 months 9-12 weeks 75-80% reduction
Security Assessment Plan (SAP) Support

The Security Assessment Plan defines how controls will be assessed. smartNOC provides test procedures and automated validation for technical controls:

Doghouse Assessment Procedures

  • Interview Automation: Doghouse queries CMDB and configuration management for policy/procedure evidence
  • Examine Automation: Automated extraction of configuration files, policy modules, and system settings
  • Test Automation: Executable test cases for each technical control with pass/fail criteria

Sample Test Cases

Control Assessment Procedure Doghouse Test
AC-3: Access Enforcement Verify RBAC policies are enforced Attempt unauthorized access, verify denial, check audit log
AU-9: Audit Log Protection Verify logs cannot be modified Attempt log modification, verify denial, validate hash chain
SC-8: Transmission Confidentiality Verify encryption for network traffic Capture network traffic, verify TLS 1.3, validate certificates
CM-3: Configuration Change Control Verify changes require approval Attempt unapproved change, verify CMDB blocks, check workflow

3PAO Efficiency: Assessors can review Doghouse test results and re-run tests on-demand, reducing assessment time and cost.

Continuous Monitoring (ConMon)

ConMon Capabilities

Most modern ATOs require continuous monitoring as a condition of authorization. smartNOC's ConMon capabilities exceed baseline requirements:

Automated ConMon Reporting

  • Monthly Status Reports: Automated generation of NIST SP 800-137 compliant reports
  • Change Notifications: Real-time alerts to AO/ISSO on significant changes
  • Vulnerability Tracking: Automated CVE correlation with installed packages, remediation tracking
  • Control Effectiveness: Metrics showing control performance over time
  • POA&M Updates: Automated tracking of remediation milestones and risk reduction

Security Posture Dashboards

AwarenessUI provides real-time dashboards for Authorization Officials and ISSOs:

Compliance Status

Overall compliance percentage, control effectiveness by family, trending (improving/stable/degrading), upcoming certificate expirations

Risk Posture

Open findings by severity, mean time to remediate, CVE exposure, anomaly detection alerts

System Health

Service availability, resource utilization, patch currency, backup validation, audit log integrity

Change Management Integration

All system changes flow through CMDB approval workflows, ensuring AO visibility:

  1. Change request submitted with risk assessment
  2. Automated impact analysis (affected controls, services)
  3. ISSO review and approval or escalation to AO for significant changes
  4. Implementation with automated rollback capability
  5. Post-change validation via Doghouse
  6. ConMon report updated with change details
Plan of Action & Milestones (POA&M)

smartNOC integrates POA&M tracking directly into the CMDB, providing automated updates and risk trending:

POA&M Features

  • Auto-Discovery: Doghouse findings automatically create POA&M entries
  • Risk Scoring: CVSS scores for vulnerabilities, impact analysis for weaknesses
  • Milestone Tracking: Automated reminders for upcoming milestones, escalation on missed deadlines
  • Remediation Validation: Doghouse re-tests controls to verify remediation
  • Risk Trend Analysis: Dashboard showing overall risk trend, velocity of remediation

Artifact Generation

POA&M exports in multiple formats:

  • eMASS XML import format
  • Excel with NIST/CMMC templates
  • OSCAL POA&M for FedRAMP
  • PDF for Authorization Package
ATO Cost Comparison

Industry data on ATO costs for moderate-complexity systems:

Activity Traditional Cost With smartNOC Savings
Preparation & Planning $40K-$80K $10K-$20K 75%
Security Plan Development $60K-$120K $15K-$30K 75%
Control Implementation $200K-$400K Included 100%
Evidence Collection $30K-$60K Automated 100%
3PAO Assessment $80K-$150K $30K-$60K 60%
Annual ConMon $40K-$80K $10K-$20K 75%
Initial ATO Total $450K-$810K $55K-$110K 80-85%

Note: Costs assume moderate-complexity system (IL4/IL5). High-impact systems (IL6) or FedRAMP may have higher costs but similar percentage savings.

Federal Agency Considerations

While smartNOC dramatically accelerates contractor ATOs, federal agency systems have additional requirements:

Additional Agency Requirements

  • FISMA Compliance: Integration with OMB MAX, CyberScope reporting, required metrics
  • Privacy Impact Assessment: PII discovery, data flow mapping, SORN integration
  • E-Government Act: Section 208 reporting, accessibility compliance (Section 508)
  • Agency-Specific Policies: Custom overlays, additional controls, local procedures

smartNOC Support for Agency Systems

  • OSCAL-formatted security artifacts for automated OMB reporting
  • Integration with agency enterprise services (identity, logging, SIEM)
  • Support for agency-specific overlay controls
  • Federal cloud hosting options (FedRAMP-authorized infrastructure)

Typical Agency Timeline: 3-6 months for smartNOC-enabled ATO vs. 18-24 months traditional

Get Started with ATO

Schedule a consultation to discuss your ATO requirements. We'll provide:

  • Gap analysis against your current state
  • Customized timeline and cost estimate
  • Control mapping specific to your system type
  • Demonstration of automated assessment procedures
  • 3PAO referrals (if needed)